We are finding that there is occurring in the field a habit to drop large prop/panel braces from height and the mass/velocity of the outer section impacting onto the inner section is damaging the shaft of the bolts which retain the feet on the panel brace. The impact can also cause damage to the welds retaining the sockets and the adjustable thread. This may cause a problem in the field if the units are not inspected after each use as described in the AS3850 standards.
Read more...
 

Panel Brace Inspection Sheet

E-mail Print
STARTING WITH THE INNER SECTION FIRST DO THE FOLLOWING.

1. Check the weld on the inner foot.

2. Check the bolt on the inner foot. Check that the nut is tight on bolt. Look for impact damage on bolts which can occur when the Brace is dropped from height. If damaged replace immediately with Structural Steel grade 8.8 bolts and Nyloc Nut to suit. DO NOT REUSE PARTS.
Read more...
 

Maintenance Procedures for Servicing Shisham Square Push Pull Props

E-mail Print
All hire props returned at end of hire are required to undergo a maintenance check carried out by Shisham employees trained in maintenance and manufacture of the original square props before they are placed back in the hire stock.

The following procedures are required to be followed to ensure the hire stock is at a safe and satisfactory working condition.